B.I.M. Level 1 | B.I.M. / 3D | Cincinnati Commercial Contracting

B.I.M. Level 1

Fast Paced/Cost Effective

Includes the following:

  1. An initial 3D meeting with B.I.M. Director.
  2. A 3-dimensional interior/exterior computerized building model.
  3. A 3D site plan.
  4. Client’s choice of:
    (4) Exterior images
    (2) Interior images
  5. A final 3D meeting with B.I.M. Director.