B.I.M. Level 3 | B.I.M. / 3D | Cincinnati Commercial Contracting

B.I.M. Level 3

Highest Level of Detail/Minimize Field Changes

Includes the following:

  1. Everything included in B.I.M. Level 2.
  2. Most detailed 3-dimensional interior/exterior building model.
  3. (3) 3D meetings by B.I.M. Director with client.
  4. (6) Clash detection by B.I.M. Director.
  5. Clients choice of:
    (5) Exterior images
    (2) Additional exterior rendering, during different times of day/year
    (6) Additional interior images
    (3) Additional interior panoramic renderings
    (3) Interior renderings, with artificial lighting